Raffles Consulting Services
Build a PACT supplier qualification record linking technical requirements, trials, corrective actions, acceptance and local capability growth.
A PACT supplier qualification record should prove that a local partner can meet the agreed technical and operational requirements, not merely that funded activities were completed. The scheme supports partnerships between large enterprises and local companies across supplier development and other collaboration modes. Both parties need one traceable route from the buyer’s requirement to tested acceptance and sustainable supplier capability.
Freeze the PACT supplier qualification baseline
List the product, process or service being qualified, applicable drawings and standards, volumes, tolerances, quality controls, cybersecurity or safety requirements, evidence format and authorised approvers. Separate mandatory acceptance conditions from improvement targets. Record the baseline capability so the partnership can show what changed without overstating the result.
EDB’s current PACT scheme page describes supplier development, co-innovation and other partnership modalities and the types of costs that may arise. The enhanced PACT announcement explains the wider collaboration scope. The parties must still follow their actual project approval and commercial contracts.
Control trials, failures and corrective work
Give every sample, test batch and process trial a unique identifier. Record input material, machine or software version, operator, method, result and deviation. Where a test fails, preserve the result, identify the cause and approve the corrective action before repeating it. Do not replace an unsuccessful report with a clean final version that hides the development path.
Keep buyer engineering, supplier production and independent testing responsibilities clear. If equipment, software, training or professional services are used, connect them to the capability gap they address. A purchased asset is not capability unless the supplier can operate it consistently and the buyer can verify the required output.
Separate project acceptance from commercial onboarding
Use an acceptance matrix that maps every requirement to evidence, reviewer, status and exception. Record conditional acceptance and the dates by which residual actions must close. Then complete any separate approved-vendor, purchase-order, insurance, data, quality or contract processes required for ordinary commercial supply.
At closeout, measure lead time, defect or service performance against the agreed baseline and preserve the capability records for future orders. Grant or project completion does not guarantee a purchase commitment. State the commercial outcome accurately and keep forecast demand separate from placed orders.
Turn the decision into a controlled file
Use a dated decision record that identifies the applicant, business need, current official source, chosen route, responsible owner, costs, milestones and evidence. Separate facts already verified from forecasts and assumptions. A catalogue listing, supplier statement, consultant recommendation or portal acknowledgement does not establish approval. The company remains responsible for its declarations and commercial decision.
Give each quotation, contract, invoice, payment and deliverable a stable reference. Preserve earlier versions and explain material changes instead of silently replacing them. Where the authority, tax adviser, auditor or another professional must decide a point, record the open question and obtain the required view. Do not convert uncertainty into a confident eligibility statement.
Review before commitment and again before closeout
Run four reviews: suitability, authority, implementation and closeout. At suitability, test the entity, activity and business outcome. Before commitment, freeze the proposed scope, vendor and financial assumptions. During implementation, compare actual work with approved terms. At closeout, reconcile deliverables, accepted results, invoices, full payment, operating evidence and obligations that continue.
Name the person who may approve each stage and the records that person must see. Procurement should not treat a draft application as permission to contract. A project team should not treat supplier completion as company acceptance. Finance should not treat a submitted claim as cash received. Clear status words prevent accidental commitments and weak reporting.
Handle exceptions without rewriting history
Maintain an exception log for changed facts, delayed milestones, supplier variations, cost movements, missing records and failed tests. State the effect on scope, eligibility, timing and expected value. If an authority decision or formal variation is required, use the published route before relying on the change. Silence and helpdesk receipt are not approval.
If a material defect appears, pause the affected acceptance, filing or claim item. Keep original evidence, assign corrective action and set a review date. Do not backdate records, move costs between categories or adjust a baseline after seeing the result. A candid exception with an owned resolution is more credible than a clean-looking file that cannot explain what happened.
Plan handovers before the original project team disperses. The handover should identify the current version, source locations, system access owner, next review date, open exceptions and any condition that continues after payment or filing. Restrict personal, financial and commercially sensitive records to authorised users, while giving each responsible owner enough information to perform the assigned control. Record the external event that should trigger an earlier review, such as a changed programme page, revised authority letter, supplier failure or material business change.
Verify the final outcome independently
Ask someone who did not prepare the final pack to compare the decision, current official source, approved terms, deliverables, payments and operating evidence. Recalculate totals and sample source records. The reviewer should be able to reproduce the conclusion without relying on the preparer’s memory. Record unresolved points with named owners and dates.
Use the PACT partnership value guide for the wider decision and keep this article as the narrower operating guide. After submission, preserve the receipt and reconcile questions, adjustments and the final registered or paid outcome. Continue any reporting, retention, asset-use or other condition that survives closeout.
Practical review checklist
- Requirements version fixed
- Trials uniquely identified
- Failures and corrections retained
- Acceptance authority recorded
- Commercial onboarding kept separate
The PACT supplier qualification record is complete when both parties can reproduce the tested requirements, explain every material exception and distinguish technical acceptance from a future purchase decision.