Job-redesign baseline measures help employers prove whether flexible work improved service, productivity and employee experience.
Job-redesign baseline measures should describe how work performs before a flexible-work change, using data that can be measured again after implementation. The baseline is not a funding estimate or an employee opinion poll on its own. It is a dated record of service, productivity, workload and employee experience.
A useful baseline gives management a fair comparison. It also prevents a project from claiming every later improvement while ignoring demand changes, hiring, seasonality or another system rollout.
Define the decision before choosing a measure
Write one decision the project must support. The company may need to decide whether a redesigned role can preserve customer coverage with fewer manual handoffs, whether hybrid scheduling reduces vacancy pressure, or whether a new workflow improves completion time without shifting work to on-site colleagues.
The MOM parliamentary answer dated 10 September 2026 confirms that WDG(JR+) can support projects that redesign roles and work processes to accommodate employees at different life stages and with caregiving responsibilities. This supports a genuine redesign of work. It does not establish that a particular measure or cost will be approved.
Name the affected role, team, site and period. If several roles are changing in different ways, keep separate baselines before producing a combined management view.
Describe the starting work accurately
Record the current duties, volumes, service hours, handoffs, approval points and location requirements. Note the systems used and the work that still depends on paper, physical access or one manager. Include unusual arrangements that have become normal through habit.
Choose a representative baseline period. Four to twelve weeks may be useful for frequent processes, but a seasonal activity may need the same period from an earlier year. State public holidays, absences, campaigns, system outages and other events that distort the result.
Freeze the source data and calculation method. A later reviewer should be able to reproduce the number from the retained records rather than relying on a chart.
Balance business and employee outcomes
Use a small set of measures that reflect the reason for the redesign. Business measures can include turnaround time, first-time completion, rework, service coverage, queue length, overtime and error rate. Employee measures can include schedule predictability, avoidable travel, workload distribution, access to supervision, retention and reported ability to manage caregiving needs.
Do not treat presence as productivity. Login time or office attendance may be easy to count but may say little about completed work, quality or customer outcomes.
The TAFEP employer guide on flexible-work arrangement requests sets out the formal request process. Project research can inform operating design, but it does not replace the employer’s duty to consider an individual request properly.
Define each measure before collecting data
For every measure, write the numerator, denominator, unit, data source, owner and collection frequency. Define when a case starts and ends. Explain how reopened cases, partial completions and cancelled work are treated.
For example, average completion time can hide a small group of cases that wait much longer. Record the median and a higher percentile where delays matter. An error rate should use a stable definition of an error and a clear population.
Keep counts alongside percentages. A drop from two errors to one may look large as a percentage but may not support a broad conclusion.
Check comparability and outside influences
Compare like with like. If the team handled more complex cases after the redesign, record the change. If demand fell, do not attribute the shorter queue entirely to flexible work. Note recruitment, pricing, policy, supplier and technology changes during the review period.
Where possible, compare the redesigned group with a similar unchanged group or compare the same work across matched periods. This is not a scientific experiment, but it makes the conclusion more honest.
Record confidence limits in plain language. If data is incomplete or the sample is small, say that the result is an early indication and set a later review date.
Protect employee information
Collect only what the decision needs. Aggregate employee feedback where individual identification adds no value. Limit access to identifiable information and separate grant evidence from sensitive HR records.
Tell employees what is being measured and why. Give them a route to correct factual errors. Avoid covert monitoring or an activity measure that encourages constant online presence instead of useful work.
Check whether the measure disadvantages employees who use flexible arrangements. Promotion access, training invitations, desirable assignments and manager contact can reveal an uneven outcome that productivity figures miss.
Use a baseline measure sheet
| Field | What to record | Reason |
|---|---|---|
| Decision | Question management must answer | Keeps the analysis focused |
| Population | Role, team, site and period | Defines what is compared |
| Measure | Formula, unit and source | Makes the result reproducible |
| Context | Seasonality and other changes | Prevents false attribution |
| Employee effect | Workload, access and experience | Tests fairness |
| Review | Owner, date and threshold | Turns data into action |
Set the review before implementation
Choose an early operational review and a later outcome review. The early review can catch access, scheduling and handoff failures. The later review can test whether productivity, service and employee effects lasted.
The MOM WDG(JR+) factsheet explains the current programme route and headline support. Keep the approved scope and claim evidence separate from the management analysis. A strong baseline does not promise funding, and funding approval does not prove that the redesign worked.
Agree what result would lead management to keep, change or stop the arrangement. Record mixed findings instead of forcing a success story.
The flexible-work job-redesign evidence guide covers the wider project file. The Singapore business support decision guide is the pillar cornerstone.
Reliable job-redesign baseline measures let the company improve the operating model without overstating the result. The Enterprise Support and Grants hub connects the broader support library.