Raffles Consulting Services

EDGE standards costs: consultant or certification body?

Separate EDGE standards costs for SS 680 consultancy from accredited certification-body work and keep the evidence aligned.

EDGE standards costs can involve two different specialists. The consultant helps the company design and implement the management or technical work. The certification body independently assesses conformity. Combining both roles in one vague quotation makes the scope, independence and later claim evidence harder to test.

Start with the standard and intended result

Name the exact standard, product, process or management system and the business reason for adopting it. Record the current gap, the target certification or compliance result and the operation that will change. A broad aim such as becoming certified does not show whether the project needs readiness advice, testing, an accredited assessment or all three.

Use the current EDGE activity page for the chosen standard, not a general vendor brochure. Activity pages can identify required application documents, supported deliverables and expected business projections. The official EDGE FAQ also explains the different qualification rules for consultants and conformity assessment bodies.

Define the consultant work

Consultancy should have a clear diagnosis, implementation plan, working sessions, document changes, training and handover. Identify which gaps the consultant will examine and which company employees own the resulting controls. A consultant should not merely reproduce the standard or sell a certificate. The proposal should show how the business will build a capability that remains useful after the project.

Enterprise Singapore states that professional consultancy costs are supportable for the standards activity when the appointed consultant possesses SS 680 certification and is suitable for the project. The consultant must be proposed upfront and, after approval, reflected in the Letter of Offer. Claim invoices should therefore reconcile to the approved consultant, scope and period.

Define the certification-body work

The certification body performs the independent conformity assessment. Its work can include application review, audit or inspection, testing coordination, findings and the final certificate or report. Keep this quotation separate enough to identify assessment fees, locations, stages, surveillance assumptions and any excluded testing. Do not describe an assessment result as guaranteed.

The current FAQ requires the appointed conformity assessment body to be accredited by the Singapore Accreditation Council or an internationally recognised accreditation body within the named ILAC, IAF or APAC mutual-recognition arrangements. Verify the relevant accreditation scope, not only the organisation name. The SACiNet directory can support a current Singapore accreditation check.

Create a two-column cost map

Place every quotation line under consultancy, conformity assessment, testing, internal implementation or excluded business cost. Add the deliverable, supplier, amount, payment milestone and evidence owner. This map prevents a single line called certification services from hiding work performed by different parties. It also exposes travel, annual surveillance or renewal charges that may sit outside the approved project.

Check for duplicated tasks. A consultant may perform an internal readiness review, while the certification body performs the formal audit. Those are related but not interchangeable. If both quotations include the same document review or training, ask each supplier to explain the boundary. The company should be able to match every cost to one necessary project outcome.

Protect independence and manage findings

Record who advises, who decides, who implements and who assesses. The company owns implementation. The consultant can recommend controls, while the certification body must preserve the independence required by its accreditation. Avoid commercial arrangements that make a certificate appear to be bundled with consultancy before the assessment has occurred.

Plan how nonconformities will be handled. Name the employee who will receive a finding, determine root cause, approve corrective action and provide evidence. Allow time between readiness work and formal assessment. If the audit identifies a weakness, the schedule should support a genuine correction rather than pressure the assessor to treat unfinished work as complete.

Build the application evidence file

Keep the selected activity page, standard scope, consultant certificate, supplier proposals, accreditation evidence, internal gap record and business projections together. Date each source and retain the version relied on. For a sector-specific activity, use the stated application checklist. For example, the EDGE steel and aluminium structures activity calls for both the consultant and certification-body materials.

Reconcile names precisely. The company name, standard, site, consultant, certification body and quoted deliverables should agree across the application. Where an accreditation covers only certain services, record why the selected scope matches the intended assessment. Do not treat a logo on a quotation as proof of current accreditation.

Prepare the claim trail before work begins

Create folders for approval, consultancy, implementation, assessment, payment and results. Preserve signed deliverables, meeting records, training attendance, changed procedures, invoices, proof of payment and the final accredited certificate or compliance report where required. Link every item back to the approved cost map and Letter of Offer.

If a named supplier or scope becomes unsuitable after approval, read the current change rules before committing to a replacement. The general EDGE FAQ says vendor changes after approval are not allowed and may require termination and a fresh application. The EDGE project-change guide explains that separate control.

Use a final management review

Before submission, ask management to confirm that the standard supports a real customer, regulatory, quality or market objective. Confirm that internal owners can maintain the system after the advisers leave. Review the cost map against cash flow because EDGE is reimbursement based and the company remains responsible for full payment and project delivery.

At completion, compare the intended result with the actual certificate, report and operating change. Record open surveillance duties and renewal dates outside the grant file. This turns the project into a maintained business capability instead of a one-off document exercise.

A sound standards project keeps advice, implementation and independent assessment visibly separate. When the suppliers, costs and evidence follow that structure, management can judge both grant support and certification readiness without confusing one for the other.

Reconcile the three final records

At closeout, compare the consultant report, company implementation record and certification-body result. Each document serves a different purpose, yet names, sites, scope and dates should agree. Explain any excluded location, product or process. If the assessor issues findings, retain the company response and closure evidence rather than presenting the certificate alone.

Management should also record ongoing obligations, including surveillance, recertification, staff competence and document control. These future duties may not be part of the supported project, but they determine whether the result stays useful. Assign a budget and owner before the first surveillance date appears on a calendar.