T-Up programme: define the technology question first

Define a T-Up programme technology question before researcher secondment, with scope, baseline, milestones, transfer and commercial ownership.

A T-Up programme technology question should describe the technical uncertainty that a researcher will resolve, not merely a desire to add artificial intelligence or automation. The programme attaches research scientists, engineers and technical experts to an eligible local company for an innovation project of up to two years. A precise question helps the company choose the right expertise, evidence and transfer plan.

Current position for T-Up programme technology question

Enterprise Singapore states support of up to 70 per cent of allowable costs for an SME or startup and up to 30 per cent for a large local enterprise, capped at S$250,000 per project.

Eligibility includes Singapore registration, at least 30 per cent local equity and the published group turnover or employment test. The company must be able to finance and complete the project.

The programme is administered by A*STAR and can cover fields including computing, manufacturing, materials, engineering, biotechnology, medical technology and artificial intelligence.

Build the working plan

Write the current technical baseline, observed failure, constraint and target performance. Remove business goals that cannot be tested through the proposed research work.

Define the experiments, data, equipment, access, safety and intellectual-property questions that must be settled before attachment.

Set milestone decisions such as continue, change method, protect intellectual property, pilot or stop. Give each decision an evidence threshold and accountable executive.

Plan capability transfer through paired employees, documentation, code or method review and a final handover. The result should not leave with the secondee.

Keep evidence as decisions are made

Keep the technical brief, expert-matching record, approved scope, experiment logs, data lineage, design decisions, milestone results and staff learning evidence.

Record foreground and background intellectual property, publication rights, confidentiality and access before research begins.

Track commercial follow-through separately from scientific success. A technically valid result may still require another product, regulatory or market decision.

See how the control works in practice

A manufacturer wants AI inspection but has not measured its current defect-detection rate. The technology question should identify the defect classes, image conditions, acceptable false-reject rate and available labelled data. Without that baseline, the company cannot tell whether a model is better than the existing inspection process or choose the right researcher.

This example is an operational illustration. It is not a statement that a specific application, grant, incentive, tax treatment, insurance claim or work pass will be approved. The organisation should compare its facts with current official terms and obtain the legal, tax, technical or agency guidance required before committing.

Review T-Up programme technology question before commitment

Bring together the business owner, finance lead and the person responsible for the underlying activity. Identify which statements come from an official source, which are management assumptions and which still need confirmation. Finish with a documented proceed, revise or stop decision, a named approver and the latest safe date for action.

Keep the commercial case separate from any support, tax or immigration case. The activity should remain affordable if support is lower than expected, approval takes longer or the official position changes. Model cash needs, implementation dependencies and exit costs. An application status or catalogue listing is not a substitute for management judgement.

After commitment, compare current facts with the approved scope, contract and earlier decision whenever cost, timing, vendor, ownership or delivery changes. Date every exception and preserve the original record before correcting it. Where a change could affect eligibility or treatment, obtain confirmation before relying on it in a claim, filing or application.

Assign owners and review dates

Create a responsibility table for T-Up programme technology question. Give one person ownership of the official-source check, one person ownership of delivery and one person ownership of financial evidence. Name the employee who can approve a change and the adviser who must be consulted when the issue falls outside the company’s competence.

Set review dates around actual events. Useful points include application submission, approval acceptance, contract signature, first payment, implementation completion, claim preparation, tax filing and the end of a monitoring period. At each review, compare actual cost, timing and outcome with the approved case and assign a due date for every correction.

Keep a source register with the page title, URL, access date and rule used. Save the company’s own approval or award separately because public pages do not replace case-specific conditions. When official guidance changes, record whether it affects only future applications or also the live matter. If the effect is unclear, pause the affected commitment and seek a written position.

Before closing the file, ask an employee who was not responsible for delivery to follow the evidence from the original decision to the final result. Record missing links, correct them where possible and explain remaining limitations honestly. This independent read-through is especially useful when teams, vendors or advisers produced separate records.

Read the primary sources

Start with the principal official source and the supporting official source. Public terms can change, while a company’s Letter of Offer, Letter of Award, approval, policy, contract, tax assessment or pass decision controls its own case.

For the wider decision, use our Singapore business support decision guide. Related implementation detail is available in our T-Up secondment continuity record and cross-centre innovation project handoff.

Final review checklist

  • state the technical uncertainty
  • measure the current baseline
  • define experiments and data
  • settle intellectual-property terms
  • set milestone decisions
  • pair the researcher with staff
  • plan commercial follow-through

The T-Up programme works best when the company brings a bounded technology question and leaves with an internal capability. Define both before selecting a researcher or estimating support.