Raffles Consulting Services

EDGE Common Criteria grant: build the application file

Build an EDGE Common Criteria grant file for ISO 15408 certification, with the right vendors, costs, deliverables and claim evidence.

An EDGE Common Criteria grant application should begin with the IT product that needs ISO 15408 evaluation, the security assurance target and a realistic certification plan. This activity is not a general cyber-security upgrade. It supports professional services plus eligible certification and testing for a defined product, subject to the current activity page, the application assessment and the eventual Letter of Offer.

Confirm that Common Criteria is the right standard

The Enterprise Singapore Common Criteria activity page describes ISO 15408 as a framework for independent security evaluation of IT products and systems. Record the product, intended users, target markets and the reason buyers or regulators need this certification. A broad wish to improve cyber security is not enough to establish fit.

Define the product boundary before seeking quotations. List the software, firmware, hardware, interfaces and version to be evaluated. Note any component supplied by another party and any planned release that could change the evaluation target. This prevents the application from mixing product development, ordinary penetration testing and certification work without a clear connection.

Screen the applicant and timing

Check that the business is registered and operating in Singapore, has at least 30 per cent local ownership through the ultimate individual owners, and has not started work or paid a deposit before submission. The activity page also says the company must not have received support for the same standard, regardless of the standard’s version.

Keep a dated no-commitment record covering purchase orders, contracts, deposits, testing reservations and supplier instructions. If preparatory technical work has begun, identify exactly what was done and paid for. Do not assume that renaming a work package makes a retrospective project new.

Appoint vendors that satisfy different tests

The consultancy and conformity-assessment roles are not interchangeable. The proposed consultant must meet the stated SS 680 requirement and be suitable for the work. The certification or testing body must have the required accreditation through the Singapore Accreditation Council or a recognised ILAC, IAF or APAC arrangement.

Obtain separate quotations that name the product version, evaluation scope, testing stages, reporting, certificate and exclusions. Verify the accreditation scope, not only the organisation’s logo. Save the evidence used for the check because the Letter of Offer and claim invoices need to match the approved parties.

Separate supported and excluded costs

Build a cost schedule for professional services, certification and testing. Exclude GST, software purchases and surveillance or renewal work after the first year where the activity page says those items are not supported. If a vendor bundles software or remediation with evaluation, ask for a priced split.

Map every line to a deliverable and payment milestone. The grant is reimbursed only after approved work is completed and paid in full. The EDGE FAQ also explains that the annual cap is shared across activities, so confirm the available balance in the Business Grants Portal rather than estimating it from internal records.

Plan evidence before the evaluation starts

The end file should include a capability-building report, training evidence where applicable, the accredited certificate, and testing or compliance reports. Agree early which party produces each item, its format, acceptance criteria and delivery date. Do not wait for the claim stage to discover that a commercial summary does not contain the required evidence.

Track product changes during the project. A security patch, architecture change or new product version may affect the evaluation target. Record the assessor’s view and use the formal change route if the approved project boundary or end date needs to change.

Keep the applicant in control

The applicant company must submit and manage its own grant through Corppass and BGP. Give the internal owner direct access to the submission, Letter of Offer, clarification requests and claim record. A consultant can prepare material, but should not be the only person who can explain the declarations or locate the evidence.

Before acceptance, compare the final certificate and report with the approved product, standard, vendor, cost and project period. Reconcile invoices to bank evidence and record the independent review. This creates a claim file that is understandable even after the technical team changes.

Work through a product-version example

A software company plans to certify version 4 of an access-control product, while version 4.1 is already in development. The application file should state which version, build and interfaces the evaluator will assess. It should also state how security patches and the later release will be handled. If the quotation covers only a general security review, it does not yet describe the certification activity.

The company can then map the consultant’s preparation work, the laboratory’s evaluation and the certification body’s output to separate deliverables. A change log should record whether version 4.1 affects the evaluation target. This is more useful than putting every cyber-security cost into one line and asking the claim reviewer to infer the boundary.

Keep a compact application record

The internal record should contain the product description, version hash or release identifier, target assurance outcome, applicant eligibility, prior-support search, no-commitment confirmation, vendor checks, quotations, cost split, project calendar and expected certificate. Add the revenue and job projections requested by the activity page, with assumptions and named data owners.

At each review, mark facts as verified, pending or changed. Save the current activity page and accreditation evidence with the access date. This makes later clarification responses consistent with the application instead of allowing technical, finance and grant teams to submit different descriptions of the same product.

Questions before commitment

Ask the evaluator to confirm the exact evaluation boundary, accreditation route, expected certificate, applicant inputs and consequences of a product change. Ask the consultant to confirm its named personnel and SS 680 evidence. Management should approve the commercial project even if support is lower than forecast, and should stop if the certification no longer answers a buyer, regulatory or market need.

Final review checklist

  • Product and version boundary recorded
  • No work or payment before application
  • Consultant certification checked
  • Assessment-body accreditation checked
  • Excluded costs removed
  • Deliverables and claim evidence assigned

A credible EDGE Common Criteria grant file connects one defined product to an accredited evaluation, eligible costs and evidence that can be reproduced at claim time. Certification ambition alone does not replace the activity conditions or Enterprise Singapore’s assessment.

For the broader route, see the Singapore business support guide. The EDGE standards vendor-cost guide and Corppass handoff guide cover the surrounding controls. The business support decision guide remains the pillar cornerstone.